They acknowledge the challenge that the designs are locked for the new G Line station (under construction) and the ESFV station (in preconstruction - they're already putting piles around the storm drain directly under the station, which would have been the ideal place to site Sepulveda's station
April 11, 2026 - 01:53 UTC
1
0
6